CHART-UR-BAR inventories many specialty items including stack stabilizer rings, exchanger extractors, MLLD Lifters, and several other item that are all focused on rigging to the center of gravity and equalizing a load.
CHART-UR-BAR’s lifting elbows are essential tool for any demolition project. The device moves old vessels, tanks and drums without lifting lugs by using the object’s wall strength as a pick point. Water cut or torch cut a hole in the top of the vessel and the lifting elbow will stab through the hole and safely take it to the ground.
The CHART-UR-BAR 5.5 Ton Offloading Platform was Designed/Fabricated for a client looking for an efficient & safe way to transport pre-fabricated PODs into an elevated structure. Upon meeting with the client and identifying areas of concern, we were able to design an Offloading Platform that accommodated multiple POD sizes while considering the allowable entry clearances areas of the already built structure. In an effort to meet the jobsites projected layout, it was designed in a fashion that allowed for loading and offloading on opposite ends. In addition, the Offloading Platform is equipped with provisions to tie-off to the structure, adding stability while transferring the load. With our design, our client is able to successfully and safely load/offload their PODs with the simple use of rollers/skates and without ever having to step off the structure. The 5.5 Ton CHART-UR-BAR Offloading Platform is efficient, safe, and requires minimal personnel to handle. Our scope of work in this project involved Design, Engineering, Fabrication, Consulting, and Equipment Rental.
CHART-UR-BAR was contacted by a client needing to remove (2) exchangers from a structure at a height of 90’ in a very enclosed area. CHART-UR-BAR was able to utilize their 65 Ton Exchanger Extractor allowing a smaller crane to fit and safely remove and install the exchangers.